Answer:
-$5,873
Explanation:
For computation of maximum one month loss in dollars first we need to find out the net exposure and maximum one month loss in percentage which is shown below:-
Net exposure = Received amount - Paid amount
= €200,000 - €50,000
= €150,000
Maximum one - month loss in Percentage = Next month percentage - (Alpha × Euro percentage)
= 2% - (1.96 × 2.5%)
= -2.9%
Maximum one - month loss in Dollars = Net exposure × Current spot rate of the euro × Maximum one - month loss in Percentage
= €150,000 × $1.35 × (-0.029)
= -$5,873
The complete question is as follows:
The admission directory of Big City University has a novel idea. He proposed using the IQ scores of current students as a marketing tool. The university agrees to provide him with enough money to administer IQ tests to 50 students. So the director gives the IQ test to an SRS of 50 of the university’s 5000 freshman. The mean IQ score for the sample is xbar=112. The IQ test he administered is known to have a σ of 15. What is the 95% Confidence Interval about the mean? What can the director say about the mean score of the population of all 5000 freshman?
Answer: The 95% confidence interval about the mean is
.
The director can say that he is 95% confident that the mean IQ score of the 5000 freshmen lies between 107.84 and 116.16.
We follow these steps to arrive at the answer:
Since the population standard deviation of the IQ test is known, we can use the Z scores to find the confidence interval.
The formula for the confidence interval about the mean is:

In the equation above, X bar is known as the point estimate and the second term is known as Margin of Error.
The Critical Value of Z at the 95% confidence level is 1.96.
Substituting the values in the question in the equation above we have,



Answer:
A.- 3.45 min to produce two work units
B.- In a 8-hout shift at standard performance 274 work units are produced
Explanation:
The Standart tiem per piece would be:

Given your numbers it will be:

This is the time per cycle to produce 2 work units
Now, in an 8 hours shift there are 480 minutes. Dividing between the standard time of a cycle we get the standard performance

Rounding, we will be getting 137 cycles
Lastly, because each cycle produce 2 work units we are having a total of 274 Units
Answer:
This request cannot be honored because the securities must be paid for, in full, to process a transfer and ship request
Explanation:
I just bought shelves and I use it to store all my nail supplies