Answer:
Step-by-step explanation:
Steps Property
x(1 + y) + y(2 + x) Given
x + xy + 2y + xy Distributive property
x + xy + xy + 2y Commutative property of addition
[a + b = b + a]
x + (xy + xy) + 2y Associative property of addition
[(a + b) + c = a + (b + c)]
x + 2xy + 2y Combine like terms
Answer:
340
Step-by-step explanation:
The first step is finding the percentage of those who fail within 19 months.
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

The proportion is the pvalue of Z when X = 19. So



has a pvalue of 0.6808.
Jolt is expected to replace 0.6808 of the connectors sold. Out of 500, that is, on average, 0.6808*500 = 340.
Jolt expects to replace, on average, 340 of the connectors sold.
Step-by-step explanation:

Answer:
an expression of more than two algebraic terms, especially the sum of several terms that contain different powers of the same variable(s).
Answer:
C
Step-by-step explanation: