Answer:
3 4/5
Step-by-step explanation:
19/5 there are 3 wholes of 5.
5,10,15
3 wholes later we are left with 4
You just write it as 4/5. Meaning, the 4 is just left.
Answer:
21
Step-by-step explanation:
21
Answer:
5 bags of cement are required.
Step-by-step explanation:
Since to make concrete, the ratio of cement to sand is 1: 3, if cement and sand are sold in bags of equal mass, to determine how many bags of cement are required to make concrete using 15 bags of sand the following calculation must be done:
Cement = 1
Sand = 3
3 = 15
1 = X
15/3 = X
5 = X
Therefore, 5 bags of cement are required.
The question is asking to calculate how fast is the water level rising when the water is 9 inches deep and base on the said question or problem, and in my own understanding and computation about the said problem, the speed of the rising of the water level is 24/63 feet per minute. I hope this would help