Using the normal distribution, it is found that the correct option is:
In a <em>normal distribution</em> with mean
and standard deviation
, the z-score of a measure X is given by:
- It measures how many standard deviations the measure is from the mean.
In this problem:
- The mean on the Wechsler Scale is of 100, hence
.
- The standard deviation is of 17, hence
.
- Brianna had an score of 117, hence

Then:



Hence, the option d is correct.
To learn more about the normal distribution, you can check brainly.com/question/24663213
(3,4) and (-5,6) are "coordinate planes".
These appear in algebra and math when you're graphing. These coordinate planes consist of "x" and "y" (x,y). The x's (which are 3 and -5 in your situation) should be graphed accordingly using the x-axis and the y's (which are 4 and 6 in your situation) should be graph accordingly using the y-axis.
II. Triangle ABC is obtuse and III. Triangle ABC is acute, because acute is less than 180° and obtuse is between 180° and 270°
A=1/10, b=1/12, c=1/15 (these are the rates for each worker...)
1.)
2(1/10)+4(1/12)+t/15=1
1/5+1/3+t/15=1
(3+5+t)/15=1
3+5+t=15
8+t=15
t=7
So it would take c 7 hours to finish the job.
2.)
1/40-1/60
(3-2)/120
1/120
The drain rate is 1/60. So you will need to find t when the tank is empty, while starting at 2/3 capacity...
2/3-t/60=0
(40-t)/60=0
40-t=0
t=40
It would take 40 minutes to empty the tank when it is 2/3 full.