Answer:
<h2>B. 7.1</h2>
Step-by-step explanation:
Given the sample data 2 6 15 9 11 22 1 4 8 19, before we can get the standard deviation, we need to first calculate the mean.
mean = 2 +6 +15 +9 +11 +22 +1 +4 +8 +19/10
mean = 97/10
mean = 9.7
Standard deviation for ungrouped data is expressed using the formula;



<em>Hence the standard deviation of the sample data is 7.1</em>
Answer:
Kim should'nt have put 2 because y would be bigger than 2
by-step explanation:
Answer:
x = -8 or x + 8 = 0
Step-by-step explanation:
As the slope is undefined, the line is parallel to y-axis
The equation of the line : x = -8
Answer:
Suppose we have a total of 16 drummers.
for the first pattern we have 2 drummers in each row, this means that we have a total of 16/2 = 8 rows.
Now, for the second pattern, we have 4 times as many in each row, so we have 4*2 = 8 drummers in each row, then we have 16/8 = 2 rows.
You can see that in each pattern we have the same number of drummers, but a different number of rows.
Now, we only can do this if the total number of drummers is a multiple of 8 (because in the second part we want 8 drummers in each row, so if we want that the numbers of rows to be a whole number, then we must have that the total number of drummers is a multiple of 8)
Answer:What's the problem for question 2? And I may be able to help you with it.
Step-by-step explanation: