1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Irina18 [472]
3 years ago
6

Materials requirements planning (MRP)

Social Studies
1 answer:
Vika [28.1K]3 years ago
3 0

Answer: Option C

Explanation:

Material resource planning is a planning tool used in a production company to plan and calculate the required materials for production at the right quantity and right time.

Option C is the best answer because MRP is always used in manufacturing companies and production companies to plan materials resources at the right quantity and price. With this planning, a vendor can deliver the right materials at the correct quantity as option c states

You might be interested in
2. Why is the Middle East also called Southwest Asia/North Africa?<br> I<br> eaker notes
alexira [117]

Answer:

Will The Middle East is the nick name for North and I think it is the same for Southwest

Explanation:

6 0
3 years ago
A condition that causes the sufferer to worry excessively and uncontrollably about all kinds of situations is called
melisa1 [442]
Stress, anxiety, possible panic attack.
4 0
3 years ago
Read 2 more answers
How are folktales and fairy tales related?
xz_007 [3.2K]
Both fairy<span> tales and folk tales are instructive.</span>
5 0
3 years ago
Read 2 more answers
What makes a source credible
dolphi86 [110]

Answer:

Backed up evidence & no bias

Explanation:

A source is credible when backed up with with evidence and no bias whatsoever.

5 0
4 years ago
Read 2 more answers
Poorly written code that sends the processor into panic, consumes all resources, and ends as a denial of service is referred to
Ad libitum [116K]

Poorly written code that sends the processor into panic, consumes all resources, and ends as a denial of service is referred to as a Race Condition.

A race condition or race hazard is a condition in electronics, software, or any other system in which the essential behavior of the system depends on the sequence or timing of other uncontrollable events. It is an error if one or more of the possible behaviors is undesirable.

A race condition is an undesirable situation that occurs when a device or system attempts to perform two or more operations simultaneously, but due to the nature of the device or system, the operations must be performed correctly in the correct order.

Learn more about Race Condition here: brainly.com/question/13445523

#SPJ4

4 0
2 years ago
Other questions:
  • Which of the following state policies is most likely an attempt to change immigration policies? a) allowing undocumented workers
    13·1 answer
  • Rigid, inflexible, and maladaptive patterns of behavior or ways of relating to others, which ultimately become self-defeating be
    10·1 answer
  • The top layer of the soil in the diagram is composed MAINY of?
    5·1 answer
  • What are the meaning of these words
    7·1 answer
  • Broker K arrives to present an offer to Mrs. G, an invalid, and finds her son and his wife also present. Both individuals persis
    9·1 answer
  • James, a 6-year-old, can correctly name objects, catch a ball and throw it, and write his ABCs in proper sequence. His younger b
    11·1 answer
  • How was religion important to American identity?
    11·1 answer
  • Why wouldn’t we want the Governor to be able to appoint all of Georgia’s judges?
    5·1 answer
  • Critically discuss how females are discriminated against in sporting activities. Give examples to illustrate your answer.​
    14·2 answers
  • Consider the following scenario: It is the last quarter of the championship game. Your best athlete is knocked down, and you thi
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!