Answer:
n^22 (I love your profile picture by the way)
Step-by-step explanation:
Answer:
g(1) = 0
Step-by-step explanation:
To evaluate g(1) , substitute x = 1 into g(x), that is
g(1) = 4 - 2(3 - 1)
= 4 - 2(2)
= 4 - 4
= 0
Step-by-step explanation:
please type the question properly
Answer: D) Flat area with a large number of plants
The roots of the plants hold in the soil, which prevents/reduces erosion.
The steeper slope means gravity pulls down the soil material faster, since there is less ground in the way to hold it up, so to speak. So flatter areas are less prone to erosion compared to steeper areas.
So that's why overall, flatter areas with lots of plants would have the least erosion.
Answer:
3.6 hours
Step-by-step explanation:
Blake can do work in hours = 9
Blake can do a part of work in 1 hour = 
Ned can paint the same room in six hours.
Ned can do a part of work in 1 hour = 
They can do a part of work together in 1 hour = 
=
Now they can do
part of work in hour = 1
So, they can do whole work in hours = 
= 
Hence it will take 3.6 hours to paint the room if they work together.