Your answer is B. twice v.
This is because if you were to write out 2v as an expression with its operations, it would be 2 × v, and if you are multiplying v by 2, then the result will be twice the value of v.
I hope this helps!
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
f(x) -g(x) = -3x-5 -(4x-2)
distribute
-3x-5 -4x+2
combine like terms
-7x-3
Answer:
-7x-3
<span> A line that never changes, so you can choose whatever two points you want and you will always get the same slope.
</span>