1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Jobisdone [24]
3 years ago
13

Mildred cut a 9 foot board into two pieces the long piece is twice as long as the short one how long is the short piece

Mathematics
1 answer:
velikii [3]3 years ago
7 0

The short piece is 3 feet long

Step-by-step explanation:

The given is:

  • Mildred cut a 9 foot board into two pieces
  • The long piece is twice as long as the short one

We need to find how long is the short piece is

Assume that the length of the short piece is x feet, and the length of long piece is y feet

∵ x represents the length of the short piece

∵ y represents the length of the long piece

∵ The length of the board is 9 foot

∴ x + y = 9 ⇒ (1)

∵ The long piece is twice as long as the short one

∴ y = 2x ⇒ (2)

Now we have a system of equation to solve it

Substitute y in equation (1) by equation (2)

∵ x + 2x = 9

- Add like terms

∴ 3x = 9

- Divide both sides by 3

∴ x = 3

∵ x represents the length of the short piece

∴ The length of the short piece is 3 feet

The short piece is 3 feet long

Learn more:

You can learn more about the system of equations in brainly.com/question/3965451

#LearnwithBrainly

You might be interested in
What is 5.38 in its expanded form
solmaris [256]
5.38 in expanded form is 5 + 0.3 + 0.08

Expanded form means you have to break it apart into addition.
5 0
3 years ago
Read 2 more answers
The distance between (4,10) and (6,20)
rjkz [21]

Answer:

(2,10)

Step-by-step explanation:

4 to 6 is 2 and 10 to 20 is 10 therfore you get 2 and 10

6 0
2 years ago
Read 2 more answers
The variable overhead rate variance can be defined as which of the​ following? A. Standard rate x​ (Actual hours​ - Standard hou
Katena32 [7]

Answer:

Step-by-step explanation:

In costing analysis, direct materials, labour and direct expenses aggregate to prime cost.  Alternately, the aggregate of indirect materials, labour  and expenses is termed as overhead.  Overheads are classified into fixed and variable.

Variable overhead is one which varies directly as per number of units produced

Variable overhead rate variance = actual costs -(AHxSR)

= Actual costs - (Actual hours x std rate)

= Actual hours x actual rate - actual hours  x std rate

Hence option D is right.

5 0
3 years ago
Help?! Also why do these have to be 20 digits long
Paha777 [63]
The fraction would be 7/9.
6 0
3 years ago
What is the estimated total of 674, 692, 724, and 739?
bonufazy [111]

Answer:

2800 is a good estimate

Step-by-step explanation:

Rounding to the nearest hundred

674 = 700

692 = 700

724 = 700

739 = 700

700+700+700+700 = 2800

3 0
2 years ago
Read 2 more answers
Other questions:
  • What is the slope of the line that passes through the points (-3, 5) and (1, 7)?
    14·1 answer
  • A factory produces 550 bottles of water in 25 minutes. How many bottles of water can it produce in 3 minutes?
    8·1 answer
  • An inconsistent independent system of equations is a system with
    10·2 answers
  • Write the equation that describes the line in slope-intercept form.
    9·1 answer
  • According to the graph, the __________________ is 57-43.
    11·1 answer
  • Rewrite the function by completing the square.<br> f(x) = x^2- 2x - 95
    11·1 answer
  • 9 bags with 342 cans what is the ratio and the rate
    9·1 answer
  • Write the decimal as a percent<br> 2/500 =__%
    15·2 answers
  • Find the next 3 terms: -5, -10, -20, -40
    9·2 answers
  • The function I(x) = x is called?
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!