Answer:
Base angle = 72
Vertex angle = 18
Step-by-step explanation:
Measure of the base angle = x. But there are two of them. (Definition of isosceles). Keep that in mind.
The vertex angle is 1/4 of one of the base angles. That means that the vertex is 1/4 x
All three angles = 180 degrees.
So we have x + x + x/4 = 180 degrees.
change 1/4x to 0.25x x since 1/4 = 0.25
Equation
x + x + 0.25 = 180
2.5x = 180
Solution
2.5x = 180 Divide by 2.5 on both sides
2.5x/2.5 = 180/2.5
x = 72
Answer
That means that each base angle = 72 degrees
The Vertex Angle = 72/4 = 18
Answer:
Slope=2/10 or 0.2
Step-by-step explanation:
First, pick the numbers you want to use for slope. I will be using -10 as x1, 0 as x2, -1 and y1, and 1 for y2. The formula for slope is y2-y1/x2-x1.
Plug in these numbers: 1+1 (two negatives make a positive)/0+10(again, two negatives combine to make a positive)
This makes 2/10, which divided eaquals 0.2.
You can use either 2/10 or 0.2 as your answer, depending on what your teacher requires. Have a nice day and let me know if you have any questions!! :)
Answer:
<h2>F. 12</h2>
Step-by-step explanation:
The distance between A and M i.e JM = M - J = 5-(-19)
JM = 5+19
JM = 24
If JK:KL:KM = 2:1:3
The total ratio = 2+1+3
Total ratio = 6
Dividing each length based on ratio
length JK = 2/6 * JM
JK = 1/3 * 24
JK = 8
length KL = 1/6 * JM
KL = 1/6 * 24
KL = 4
length KM = 3/6 * JM
KM = 1/2 * 24
KM = 12
<em>Hence the value of KM is 12</em>
Answer:
The expected total amount of time the operator will spend on the calls each day is of 210 minutes.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
n-values of normal variable:
Suppose we have n values from a normally distributed variable. The mean of the sum of all the instances is
and the standard deviation is 
Calls to a customer service center last on average 2.8 minutes.
This means that 
75 calls each day.
This means that 
What is the expected total amount of time in minutes the operator will spend on the calls each day
This is M, so:

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.
9514 1404 393
Answer:
5 hours
Step-by-step explanation:
The volume of the pool is ...
V = LWH
V = (10 ft)(8 ft)(5 ft) = 400 ft^3
At the given fill rate, the time it will take is ...
(400 ft^3)/(80 ft^3/h) = 5 h
It will take 5 hours for the pump to fill the pool.