First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14
The answer is six more men
Answer:
A variable is an input variable if its Input property is Yes. Its value can be input from an external source, such as an Architect call flow. A variable whose Output property is Yes is an output variable.Since both properties can be set to yes, a variable can be both an input variable and an output variable.
Step-by-step explanation:
Answer:
6%
Step-by-step explanation:
57 divided by 80 = 0.5875
.5875 rounded to the nearest tenth is 6%
Answer:
question one answer ===30
question two ===the number 49836 is divisible by 2,3,6
To illustrate the problem, refer to the following diagram, made with the ever-helpful notepad application:
|\ | \ | \h| \ | \ | \ |_____q\ x
Pretending as if that is a wonderfully-drawn triangle, we are given the distance x of the observer from the launch pad. The angle q is also stated, and is located in the diagram as shown. To look for the distance h of the tip of the rocket to the ground, we consider the following trigonometry function:
tan q = h/x
Since we are solving for h, we multiply both sides with x, giving us:
h = x * tan q
Among the choices, the correct answer is C.