The answer is A cuz - +- = +
2/3 chance you pull red on the first pull because there are 50 red to the 25 black marble
Answer:
2/10, 4/20, 8/40
Step-by-step explanation:
multiply the numerator and denominator by the same number.
It would be the reverse of reducing to the lowest denominator.
Marta’s equation has a positive y-intercept, but the scatterplot shows a negative correlation.
<h3>What is a scatter plot?</h3>
The scatter plot is a manner in which data is presented as dots on a cartesian axes, The line of best fit is a description of the data that is presented in the scatter plot.
Hence, Marta is incorrect because Marta’s equation has a positive y-intercept, but the scatterplot shows a negative correlation.
Missing parts;
Marta believes that the equation of the line of best fit for the scatterplot below is y=-5/9x+23/9. Which statement best summarizes why Marta is likely incorrect?
Marta’s equation has a positive y-intercept, but the scatterplot suggests a negative y-intercept.
Marta’s equation has a positive y-intercept, but the scatterplot shows a negative correlation.
Marta’s equation has a negative slope, but the scatterplot suggests a negative y-intercept.
Marta’s equation has a negative slope, but the scatterplot shows a positive correlation.
Learn more about scatter plot:brainly.com/question/13984412
#SPJ1
Answer:
$425.6 should be budgeted for weekly repairs and maintenance.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean $400 and standard deviation $20.
This means that 
How much should be budgeted for weekly repairs and maintenance to provide that the probability the budgeted amount will be exceeded in a given week is only 0.1?
This is the 100 - 10 = 90th percentile, which is X when Z has a p-value of 0.9, so X when Z = 1.28.




$425.6 should be budgeted for weekly repairs and maintenance.