Any changes done to the software during the operational phase of the software before project wind up is called as maintenance is a false statement.
<h3>What are operational phases?</h3>
The operational phase is known to be that phase in course of the making or construction where a given flow of the stresses is known to be mad in the medium via which the tunnel advances that is deviated.
Hence, Any changes done to the software during the operational phase of the software before project wind up is called as maintenance is a false statement because any change that is made to the software after it is deployed is known as maintenance.
Learn more about software from
brainly.com/question/28400365
#SPJ1
Answer:
You can try emailing tech support and describing your issue. In order to get the best help as quickly as possible, try providing screenshots of what happens when you sign in or describe everything you see on the screen when the problem occurs, and quote error messages directly when possible.
Answer:
The input interprets the data while it is in RAM.
Explanation:
Answer:
Control bus
Explanation:
A control bus is a PC bus that is utilized by the CPU to speak with gadgets that are contained inside the PC. This happens through physical associations, for example, links or printed circuits.
The CPU transmits an assortment of control sign to parts and gadgets to transmit control sign to the CPU utilizing the control bus. One of the principle targets of a transport is to limit the lines that are required for communication
An individual bus licenses communication between gadgets utilizing one information channel. The control transport is bidirectional and helps the CPU in synchronizing control sign to inside gadgets and outer segments. It is included interfere with lines, byte empower lines, read/compose sign and status lines.
Nolur acil lütfen yalvarırım yalvarırım lütfen yalvarırım when should you integrate technology?