Answer:
Code is in the attached screenshot.
Explanation:
Assumed it was written in Java based on your other question asked.
Answer:
B. assistant director
Explanation:
Filmmaking can be defined as the art or process of directing and producing a movie for viewing in cinemas or television. The process of making a movie comprises of five (5) distinct phases and these are;
1. Development.
2. Pre-production.
3. Production.
4. Post-production.
5. Distribution.
An assistant director can be defined as an individual who is primarily saddled with the responsibility of reviewing and making script-breakdown, making daily call sheets of the crew, arranging logistics, and tracking the film production schedule. Also, an assistant director normally functions in the pre-production process of a movie and are expected to work closely with the director and other crew members, so as to understand their requirements or needs.
Hence, an assistant director is a specific job that usually includes the important pre-production step of making the script breakdown.
Answer:
1 2 3 4 5 6 7 8 End
Explanation:
int i = 1;
while (i != 9){
System.out.print (i + " ");
i ++;
if (i == 9){
System.out.println("End");
}
}
Answer:
Option a is the correct answer for the above question.
Explanation:
RCM is an analysis tool that provides the function for analyzing the features of the physical assets for any organization. This tool is used to analyze the profits and loss problem of the organization so that an organization can earn more in his future.
The above question states that which analysis tool is used to tell about the loss factor of the organization then the answer is RCM which is stated on the option a. hence Option a is the correct answer while the other is not because--
- Option b states about FMECA which is a tool used when the organization earns loss.
- Option c states about LORA which is a repair tool.
- Option d states about TAFT which is used all over the system.