1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
anastassius [24]
3 years ago
10

1 easy 7th grade math question 10 points!!!!!!!!!!!!!! Please will give brainlist!!!!!!!!

Mathematics
2 answers:
Alex_Xolod [135]3 years ago
8 0
The First One Is The Right Answer
Musya8 [376]3 years ago
5 0

Answer:

First one.

Step-by-step explanation:

Im not sure because there is no keys that tell you if the black tile means anything or if the white is positive or negative.

You might be interested in
Hi I need help please.
trasher [3.6K]

Answer:

60x36x120

Step-by-step explanation:

Because the scale factor is 1:12, you multiply the dimension of the building by 12.

3 0
3 years ago
Danielle fill a container with soil by using a bowl. The bowl holds 3/4 cup of soil. Danielle use 13 full bowl of soil to fill t
bixtya [17]
The container holds 9 3/4 cups of soil

6 0
3 years ago
Find the third term and the common difference. 1, 4, 7, 10
dusya [7]
Each term is equal the preceding term plus 3. Therefore the next term is 13 and the difference is +3.
6 0
3 years ago
Which equation is not a linear function:<br> y=2x<br> y=x+2<br> y=x-2<br> y=x²
padilas [110]

Answer:

Step-by-step explanation:

A linear equation can be written in the form

y = mx+b.

y = x² is not linear.

4 0
3 years ago
Currently, in Littlefield, jobs arrive at 12 per day and you have (just) enough capacity at each station (i.e., the departure ra
OlgaM077 [116]

Answer:

The WIP limit is 0.50 days.

Step-by-step explanation:

The Computation of WIP limits:

to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:

Value Added Time = 12 days (arriving time)

Non-Value-Added Time = 12 days (departure time)

Efficiency = Value Added / (Value Added + Non-Value Added)

                = 12 / (12+12)

                = 12 / 24

               = 0.50 or 50%

the most obligatory throughput time will be 0.25 days to realize the profits

WIP limit = Throughput time / Efficiency  

               = 0.25 / 50%

               = 0.50 days.

The WIP limit is 0.50 days.

6 0
3 years ago
Other questions:
  • HELP ME PLEASE 20 points for both questions<br> 5-6 on 6th grade 13-1 Daily Review
    15·2 answers
  • Factor completely. <br><br> 36x^4+18x^3+40x^2 <br><br> Enter your answer in the box.
    10·2 answers
  • How do you simplify 10(4n+6)-2n?
    14·1 answer
  • Please help with this problem with steps
    8·1 answer
  • What is the value of A in the area model for finding the quotient of 4,340 ÷ 5?
    8·1 answer
  • Can you plzz do 426 div by 30 thanks you and tell me how u got it
    6·2 answers
  • Pls help if you can,,,,
    7·1 answer
  • Container A is cylinder with a radius of 6 units and a height of 6 units. A right cone has been carved from its base and has a h
    12·1 answer
  • NEED HELP ASAP!!! please!!
    8·1 answer
  • Write the expression as a single multiplication sentence without
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!