Answer:
v
Step-by-step explanation:
Answer:
[-8, 7]
Step-by-step explanation:
The range is the set of values used for the y-coordinates of the all the points of the function.
The highest value of the function is at point (8, 7), so the greatest value y has is 7.
The lowest point of the function is at point (-3, -8), so the least value of y is -8.
Range: [-8, 7]
Answer:
A
Step-by-step explanation:
Have a good day. ;-)
Answer:
D
Step-by-step explanation:
(f - g)(x)
= f(x) - g(x)
= 3x² - 4 - (x + 2) ← distribute parenthesis by - 1
= 3x² - 4 - x - 2 ← collect like terms
= 3x² - x - 6
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42