Answer:
<em>equation=</em>35+6.95h=c
5 hours= $69.75
6 hours= 76.7
7 hours= 83.65
8 hours= 90.6
Step-by-step explanation:
the equation is found by adding 35 (the cost of the machine) and 6.95 times how many hours. To find the hours after 5 just add 6.95 every time.
Answer:
3+3+3x
i think idk just getting points goog luck
Step-by-step explanation:
Step-by-step explanation:

Answer:
Yes, a minimum phase continuous time system is also minimum phase when converted into discrete time system using bilinear transformation.
Step-by-step explanation:
Bilinear Transform:
In digital signal processing, the bilinear transform is used to convert continuous time system into discrete time system representation.
Minimum-Phase:
We know that a system is considered to be minimum phase if the zeros are situated in the left half of the s-plane in continuous time system. In the same way, a system is minimum phase when its zeros are inside the unit circle of z-plane in discrete time system.
The bilinear transform is used to map the left half of the s-plane to the interior of the unit circle in the z-plane preserving the stability and minimum phase property of the system. Therefore, a minimum phase continuous time system is also minimum phase when converted into discrete time system using bilinear transformation.
So this way we can do it. Thankyou!