Answer:
The time required to finish the work by both candy and Tim working together = 36.83 minute
Step-by-step explanation:
Time taken by the candy to finish the work
= 85 min
Time taken by the Tim to finish the work
= 65 min
Thus the time taken by both to finish the work = 
Put the values of
and
we get ,
= 
= 
= 36.83 minute
Thus the time required to finish the work by both candy and Tim working together = 36.83 minute
Answer:
The answer to the question is 2 and 5
Answer:
5 is the answer
Step-by-step explanation:

Calculate 9 to the power of 2 and get 81

Add 44 and 81 to get 125

Calculate 5 to the power of 2 and get 25

Divide 125 by 25 to get 5

Answer:is 10 % because it increases in size
Step-by-step explanation:
160 cm because if I am correct, then two of the sides are labeled as 10 cm. Which means that they are both the same measurement.