Answer:
-37.5 m
Step-by-step explanation:
If we assume that "one full day" is 24 hours, then 15 hours represents the fraction 15/24 of a day. Since the drilling rate was constant, and was presumed to start from a height of 0, the height after 15 hours is that fraction of the day's work:
... (15/24)×(-60 m) = -37.5 m
Answer: $48.93
Step-by-step explanation: 789.18 x 0.062
<span> we know the length of the cable is 9m.
That means the magnitude of </span><span><span>r<span><span><span>AB</span></span><span></span></span></span>=9</span><span>m.
The unit vector, denoted u, is each of </span><span>r<span><span><span>AB</span></span><span></span></span></span><span> divided by the magnitude.
</span>u=<span>(<span><span>x/9</span><span></span></span>i−<span>y/9<span></span></span>j−<span>z/9<span></span></span>k<span>)
</span></span><span>We can also figure out the unit vector of F.
</span>u=(350i - 250j - 450k)/√(350² +(-250)² +(-450)²)
u=0.562i−0.401j−0.723<span>k
</span>
<span>Force F is directed from point A to B, then both unit vectors must be equal.
Therefore
</span>(x/9i−y/9j−z/9k)=0.562i−0.401j−0.723k
<span>We can now solve for each term
x/9=0.562----- > x=5.058 m
-y/9=-0.401--------- > y=3.609 m
-z/9=-0.723------- > z=6.507 m
The answer is
the coordinates of point a
(5.058,3.609,6.507)
</span>
Answer:
The temperature in Minneapolis was -9°F. The next day, the temperature was warmer than -9°F.
let increased temperature be x
temperature of next day = -9°f +x
Answer:
i believe 0.67 of a chance
Step-by-step explanation:
since there are two jobs and a chance that he won't get either that's three options. so the denominator is three (as a fraction). there are two jobs so the probability of James getting one of the two is 2/3. 2/3 as a decimal is 0.66666 and keeps going on and on forever. Rounded to the nearest hundredth, 0.666666 is 0.67.