1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zavuch27 [327]
3 years ago
12

A chain lying on the ground is 10 m long and its mass is 70 kg. How much work (in J) is required to raise one end of the chain t

o a height of 6 m
Physics
1 answer:
Vikki [24]3 years ago
7 0

Answer:

The work done in moving the chain is 4116 J

Explanation:

Given;

mass of the chain, m = 70 kg

length of the chain, l = 10 m

vertical height through which one end of the chain was raised, h = 6 m

Work done in raising this chain to this height is equal to potential energy due to this vertical height

W = PE

W = mgh

where;

m is mass of the chain

g is acceleration due to gravity

h is the vertical height through which the chain was raised

W = 70 x 9.8 x 6

W = 4116 J

Therefore, the work done in moving the chain is 4116 J

You might be interested in
What is the acceleration of a 59 kg object pushed with a force of 500 Newton's ?
Igoryamba

Answer:

a=500/50=10 m/s^2

Explanation:

f=m•a     a=f/m

a=500/50= 10 m/s^2

4 0
3 years ago
A car travels along a clear 10.0 km section of motorway in 6.0 minutes. It then drives through 3.0 km of roadwork in 3.0 minutes
Charra [1.4K]
  • 6min=1/10h=0.1h
  • 3min=1/20h=0.05h

\\ \bull\tt\dashrightarrow Avg\:Speed=\dfrac{Total\:Displacement}{Total\:Time}

\\ \bull\tt\dashrightarrow Avg\:Speed=\dfrac{10+3}{0.1+0.05}

\\ \bull\tt\dashrightarrow Avg\:Speed=\dfrac{13}{0.15}

\\ \bull\tt\dashrightarrow Avg\:Speed=86.6km/h

5 0
3 years ago
If a leaf falls from a tree, has work been done on the leaf? Explain.
mihalych1998 [28]

Answer:

Hope this helps!

5 0
3 years ago
Determine the approximate force (N) used to pull a sled up a 400 m hill using 1900 J of work.
Sergeu [11.5K]
The work done to pull the sled up to the hill is given by
W=Fd
where
F is the intensity of the force
d is the distance where the force is applied.

In our problem, the work done is W=1900 J and the distance through which the force is applied is d=400 m, so we can calculate the average force by re-arranging the previous equation and by using these data:
F= \frac{W}{d}= \frac{1900 J}{400 m} = 4.75 N \sim 5 N
4 0
4 years ago
Trumpeter A holds a B-flat note on the trumpet for a long time. Person C is running towards the trumpeter at a constant velocity
denpristay [2]

Answer:

Person B

Explanation:

Person B will hear the frequency that is lower than the B- flat.

5 0
3 years ago
Read 2 more answers
Other questions:
  • I need help with this please
    6·1 answer
  • What is a resource that is constantly being replenish
    12·1 answer
  • A measurement that has both magnitude and direction
    9·1 answer
  • Who is the scientist that gave us the photon as a way of describing light as a particle?
    15·1 answer
  • A 0.25-kg ball attached to a string is rotating in a horizontal circle of radius 0.5 m twice every second, what is the tension i
    14·1 answer
  • In order to close or reduce the digital divide, it is also necessary to address a gap in skills.a. True b. False
    14·1 answer
  • Please Help Me!!!
    13·2 answers
  • This is the si unit of current
    13·2 answers
  • Light travels in a straight line at a constant speed of 3.0 x 10 8 m/s for 4.1
    15·1 answer
  • A student pushes a block from rest across a frictionless surface while the block is in front of a motion detector for 3 seconds.
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!