<span> $947.50
</span> - $189.50
_________
$758.00
So, to do this first we start at the far right and go to the left.
$947.50 - $189.50_________
$ .00
0-0= 0
5-5= 0
You then bring down the decimal.
$947.50 - $189.50_________
$ 8 .00
Because you cannot subtract 9 from 7, you borrow one from the number to the left of it and 7 turns into a 17 as 4 turns into a 3. So then, 17-9=8.
17
$93-7-.50 -7- = This means the 7 has been canceled out and turned - $189.50 into the 17 above _________ 8 .00
This happens again with subtracting 3 from 8 in which you take one from the number beside which happens to be 9 and make it 8.
17
$8-3--7-.50 -7- and -3- = This means the 7 has been canceled out and turned into the 17 above
- $189.50 _________ $ 58 .00
So then, 13-8=5. Finally 8-1= 7
$947.50
- $189.50
_________
$758.00
Answer:
f(x) = 3 cos(x) + 3
Step-by-step explanation:
Answer:
see below
Step-by-step explanation:
The total number of trees is
567+324+156+89+678 =1814
Percent fir = 567/1814 = .312568908=31.26 %
Percent pine = 324/1814 = .178610805=17.86%
Percent larch = 156/1814 =.085997795=8.60%
percent cedar = 89/1814 =.049062845=4.91%
Percent hemlock = 678/1814 = .373759647=37.38%
The total should be 100 %
31.26+17.86+8.60+4.91+37.38=100.01 ( rounding error because we rounded to the hundredths place)
3/4=6/8
1/8+1/8+1/8+1/8+1/8+1/8
=6(1/8)
=6/8
Answer: 6 days.
Once you have it in that form, you just read off the values of h and k
For instance, if you had y = 2(x-3)^2 + 5, then h = 3 and k = 5. So the vertex is (h,k) = (3,5)<span />