Answer: 0
Step-by-step explanation:
C is the correct answer
$25 is constant and $1.30 is the variable cost that changes per day, therefore it would be $25 + (1.3×No. of Days)
A because I did the math and that’s what it is for I 1/2
Step-by-step explanation:
Assuming the speed of car B to be x and the speed of car A to be x+20
<u>1</u><u>5</u><u>6</u> = <u>2</u><u>0</u><u>8</u>
x. x+20
156(x+20)= 208x
156x+3120=208x
3120=208x-156x
3120=52x
x=60
The speed of car A is (x)= 60
The speed of car B is(x+20)= 80
Answer:
Work done = 150 x 5 = 750 J
Step-by-step explanation:
Work done is the measure of energy transferred to an object when a force is added causing the object to move a distance in the direction of the force.
The equation for work done is force time the distance and is measured in Joules. Therefore the formula is W = F x D
work done (W) is measured in joules (J)
force (F) is measured in newtons (N)
distance (d) is in the same direction as the force and is measured in
metres (m)
W = F x D
w = 150 x 5
W = 750 J