1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Doss [256]
3 years ago
6

The surface area of a rectangular prism is 208 cm2. Two of the dimensions are 2cm and 10cm. Find the measure of the other dimens

ion.
Mathematics
1 answer:
aliina [53]3 years ago
3 0

Answer:

7 cm

Step-by-step explanation:

SA = 208 cm^2

SA= 2*a*b + 2*a*c + 2*b*c

where:

a= first dimension = 2 cm

b= second dimension = 10 cm

c= third dimension

so we have:

208= 2*2*10 + 2*2*c + 2*10*c

208= 40 + 4c + 20c

208-40= 24c

168=24c

c =168/24

c = 7cm = third dimension

You might be interested in
URGENT HELLLLPPP!!!!!!!!
MArishka [77]
Answers:
1. A.Complementary
2. C. Neither
3. B. Supplementary
4. Z= 128

Why?
The angles for #1 equal 90. For 2 it is not either option. 3 equals 180 and for 4 is 180-52 and you get 128
6 0
3 years ago
State whether each pair of triangles is similar by AA-SSS-or SAS-. If none of
alexgriva [62]
It doesn’t tell me what to put
3 0
3 years ago
Ralph pays his workers $100 each, and labor is the only variable cost. At a quantity of 2000 chickens, how many workers does he
pshichka [43]

Ralph hires 8 workers

What is variable cost ?

Variable costs are expenses that alter as the volume of a good or service a company produces fluctuates. Marginal costs multiplied by the number of units produced make up variable costs. They can be regarded as typical expenses as well. Total cost is divided into two parts: fixed costs and variable costs.

Workers paid = $100

Assuming $1600 is given as a Total cost for the 2000 quantity for chicken and Fixed cost is $800

Total cost = $1600 out of which $800 is the fixed cost

Variable cost =  Total cost - Fixed cost

                      = 1600 - 800

                      = 800

Numbers of workers hired = Variable cost / Workers pay

Numbers of workers hired = 800 / 100

Numbers of workers hired = 8

Therefore, the number of workers that Ralph hires is 8 workers

To learn more about variable cost from the given link  

brainly.com/question/14313017

#SPJ4

6 0
1 year ago
Вычислите: 7/8:(-2 1/4):5/6:(2 1/2):(-6/25)​
scoray [572]

Answer:

= 3087 / 320

Step-by-step explanation:

8 0
3 years ago
C. How long is 10% of a 24-hour day?​
shutvik [7]

Answer:

2.4 hours

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
Other questions:
  • Which unit represents 100 meters
    8·1 answer
  • Campatible numbers are numbers in a problen that are easy ti compute
    5·1 answer
  • 9+10=????????????????????????
    6·2 answers
  • What is the domain and range of this graph
    12·1 answer
  • Write the equation in slope intercept form.
    11·2 answers
  • 10.25 divided by 0.5
    8·2 answers
  • Please help with this answer I don't understand it ​
    15·1 answer
  • HELP ASAP I NEED THE HWLP KAHALANSLABSHSNSKSBAJAM
    14·1 answer
  • You are a civil engineer working on the design of a new
    6·2 answers
  • YES OR NOOO PLEASEE ANSWER
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!