It’s E because if your multiply 5 x 2x u get 10x and 10 x5 = 50 so our answer is E 10x +50
Make into improper fraction
2 3/4= 11/4 and 1 5/6= 11/6
now multiply
11/4*11/6= 121/24 which turns to 5 1/24
I hope this helps!
Answer:
-5
Step-by-step explanation:
you have to look at the y axis
Answer:
a. The time between customers entering a checkout lane at a retail store - Continuous
b. The weight of refuse on a truck arriving at a landfill - Discrete
c. The number of passengers in a passenger vehicle on a highway at rush hour - Continuous
d. The number of clerical errors on a medical chart - Continuous
e. The number of accident-free days in one month at a factory - Discrete
Step-by-step explanation:
A discrete variable is one whose value can be counted or it is a countable variable while continuous variable is not countable and hence it is measured.
a. The time between customers entering a checkout lane at a retail store - Continuous
b. The weight of refuse on a truck arriving at a landfill - Discrete
c. The number of passengers in a passenger vehicle on a highway at rush hour - Continuous
d. The number of clerical errors on a medical chart - Continuous
e. The number of accident-free days in one month at a factory - Discrete
Answer and Step-by-step explanation: Suppose remaining credit is y and time in minutes is x. To determine a value of y corresponding to a value of x, first find the equation for the function.
Since the function is linear, the equation is of the form: y = mx + b. To determine it:
1) Find slope, or inclination, of the line:
slope (m) = 
where x's and y's are points of the function.
2) Determine the y-intercept, or b: Use a point of the function, replace them at the equation, y = mx + b, and find b.
3) The equation will be: y = mx + b
With the equation, replace x for the minutes the question is asking and calculate to find the remaining credit.
Th result will be a pair (x,y)