Shanice's rate: 93 / 1.5 = 62 miles per hour
she is 10 miles slower than twice the speed of Brandon
62 +10 = 72
72/2 = 36
Brandon is driving 36 miles per hour
B and D because the domain is the set of X coordinates. (x, y) x is your domain.
Answer:
250 batches of muffins and 0 waffles.
Step-by-step explanation:
-1
If we denote the number of batches of muffins as "a" and the number of batches of waffles as "b," we are then supposed to maximize the profit function
P = 2a + 1.5b
subject to the following constraints: a>=0, b>=0, a + (3/4)b <= 250, and 3a + 6b <= 1200. The third constraint can be rewritten as 4a + 3b <= 1000.
Use the simplex method on these coefficients, and you should find the maximum profit to be $500 when a = 250 and b = 0. So, make 250 batches of muffins, no waffles.
You use up all the dough, have 450 minutes left, and have $500 profit, the maximum amount.
Answer:
Step-by-step explanation:
-9x^3(x^2 - 4x - 21) =
-9x(x - 7)(x + 3) <===
Answer:
B. 90°
Step-by-step explanation:
Quadrilateral inscribed in the circle with center O is a cyclic quadrilateral.
Opposite angles of a cyclic quadrilateral are supplementary.
Therefore,
(b + d) + (32° + 58°) = 180°
b + d + 90° = 180°
b + d = 180° - 90°
b + d = 90°