1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
andrew11 [14]
3 years ago
6

For investments, how are risk and return related?

Social Studies
1 answer:
ivanzaharov [21]3 years ago
4 0
A) When the risk is low, the return is high
You might be interested in
5.1 Misappropriation of assets is an example of what type of accounting information threat? A. Natural and political disasters.
Karo-lina-s [1.5K]

Answer:D. Intentional acts.

Explanation:

Misappropriation of assets is when the person actual steal the company's asset.

When someone steal these assets in the company, the company becomes liable to pay for those assets.

Or the person misuses the assets for your own use except for the company use.

The example of misappropriation of assets is embezzling, skimming ,credit card abuse,Ghost employees.

Intentional acts refers to how someone intends to do something that is illegal knowing that it is illegal.

5 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
A Property & Casualty Broker-Agent also licensed as a Life-Only or Accident & Health agent must do all of the following
vazorg [7]

Explanation:

Without having any choices, I can post all of the things that the broker-agent must do prior to renewing their license. If a person is a Property & Casualty Broker-Agent and is also licensed as a Life-Only or Accident & Health agent they must follow the correct steps to get their license renewed.

They must complete, at minimum, 24 hours of instruction held by a place that has been approved by the Commissioner of the license they seek to renew. During this instruction, there must a total of 3 hours of ethics training. This must be done prior to the license being renewed, if this is not completed, the license will not be renewed.

These license for this type of broker-agent must be renewed every 2 years. If the agent-broker chooses, they can take more instruction courses including seminars and this can be rolled over to the next years training when it is time for the renewal again.

Learn more about health care agents at brainly.com/question/13157118

#LearnwithBrainly

4 0
3 years ago
Name the meridians east of 0 degrees on this globe
balandron [24]
The Greenwich Meridian (or prime meridian) is a 0° line of longitude from which we measure 180° to the west and 180° to the east.
6 0
3 years ago
Saint augustine ____. was an idealist was a materialist was a pragmatist thought of reality as an illusion thought of reality as
larisa [96]
Saint Augustine was also known as Augustine of Hippo. He became the Bishop of Hippo Regius somewhere in Africa. In Africa, he eagerly motivated African people to convert as Catholics and even performed some miracles like healing the sick.  He was acknowledged by the Catholic Church as a Saint of the Catholic Church and Patron of Augustinians.    
4 0
2 years ago
Other questions:
  • Which of the following would appear in the debits
    13·2 answers
  • A recent study compared property crime rates on various streets in a metropolitan city with the amount of traffic on them and th
    6·1 answer
  • Both Brazil and Cuba are major world producers of?
    9·2 answers
  • Mrs brown is a professional counselor her clients rave about how relaxed , cared for and important they feel in her presence. wh
    12·1 answer
  • If Chris is on trial and does not want to testify in court, which amendment protects her from testifying?
    11·2 answers
  • What is a major characteristic of federalism? O A. Some powers are given to states, and others are given to a national governmen
    13·1 answer
  • WILL GIVE 30 PTS. IF ANSWERED CORRECTLY AND FAST
    10·1 answer
  • As jordan watches, his brother burns his finger when he touches the hot kitchen stove. jordan is now intensely afraid of the sto
    14·1 answer
  • Литература. Вопросы по произведению "Тарас Бульба" 1.Где учились сыновья Тараса? 2.Что поражает при встрече отца и сыновей? 3.О
    14·1 answer
  • Read the section titled, "Aiming toward the Riches and the Saving of Souls." What had started Christendom's penetration of the N
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!