Answer:
point form (-2,3)
Equation form
x=-2, y=3
Step-by-step explanation:
solve for the first variable in one of the equation, then substitute the result into the other equation.
Time to fit 7500 cars = 7500 * 1.25 hoursnumber of hours available in week = 40 hoursnumber of workers needed = 7500* 1.25 / 40 = 234.4number required = 235
Answer:
126 minutes
Step-by-step explanation:
17.12 - 2 = 15.12
15.12 divided by 0.12 = 126 min
Answer:
<u>The correct answer is r = ∛GM*T²/4π²</u>
Step-by-step explanation:
Let's rewrite the formula to find the period of orbit of a satellite around a planet, to solve for r, this way:
T^2=(4pi^2/GM)r^3
T² = (4π²/GM) * r³
r³ = T²/ (4π²/GM)
r³ = T² * GM/4π²
r³ = GMT²/4π²
∛r³ = ∛GM*T²/4π²
r = ∛GM*T²/4π²
<u>The correct answer is r = ∛GM*T²/4π²</u>
Because a number out of 100 is a fraction, when reduced down is referred to as a percent.