Answer:
a.P<x<9.85 orx>10.15)=0.3174, Total defects=317.4
b.p=0.0026,total defects=2.6
c.Less of the items produced will be classified as defects.
Step-by-step explanation:
a.The standard score,z, is esentially x reduced by process mean then divided my process standard deviation.

Total defects=Production*Probability
=0.3174*1000

b. 
therefore:-

Defects=Probability*Production
=0.0026*1000
=2.6
c.Reducing process variation results in a significant reduction in the number of unit defects.
Answer:
Below in bold.
Step-by-step explanation:
You would join the faces with the greatest area
That is the faces with dimensions 3 feet by 5 feet.
For 300 more square feet the rent is $150 more.
Rent per additional square foot is 150/300 or 0.50.
For an additional 400 square feet the rent is an additional 400(0.50) or $200.
The rent for 1500 feet squared office is $1325.
Answer: You will need to multiply them by 5
Step-by-step explanation: 120÷24=5. So you would need to multiply all ingredients by 5 to get enough for 120 people.
Answer:
0
Step-by-step explanation:
Slope = (y2-y1)/(x2-x1)
= (-5--5)/ (9--8)
= (-5+5)/(9+8)
= 0/17
=0
The slope it 0
This is a horizontal line because the y value doesn't change. If the y value doesn't change, the slope it zero.