Answer:
SP = (1+P/100)CP.
Step-by-step explanation:
P% is our profit on our cost price.
Cp is our cost price.
We know,
Selling Price - Cost price = Profit = Profit * Cost Price
So,
SP = (1+P/100)CP.
Answer:
(a) Speed = 6.875 m/s
(b) Kinetic Energy = 1.70 kJ
(c) Average power = 1.06 kW
Step-by-step explanation:
Given:
d = 5.5 m
t = 1.6 s
W = 706 N
Part (a)
Using the equation of motion with the assumption of zero initial speed:


The speed of the sprinter then become:

Part (b)
Convert the weight of the sprinter to mass:



KE (Kinetic Energy) can then be calculated as:



Part (c)
The change of the kinetic energy is equivalent to the work done by the sprinter. The average power P is the rate of the work done and can be calculated as



Answer:
If the four number sentences at the bottom are the choices for your answer the correct one would be choice A or 1.
I hope this is what you meant if not I'll try to take my answer down and try to answer it again correctly!
Answer:
b) 95
Step-by-step explanation:
equation:
3 x 30 + 5
solve:
3 x 30 + 5 = 95
Hey there!
You can plug this into the slope equation to find the slope.
m= (y2-y1)/(x2-x1)
Plug in two points. I chose (0,4) and (1,7).
m= (7-4)/(1-0)
m= (3)/(1)
m= 3
3 is your answer.
I hope this helps!
~kaikers