the answer is 60.
all you have to do is multiply all the numbers.
3 × 4 × 5 = 60
first:
multiply two of the numbers together. anything you like.
4 × 3 is 12
and now multiply the left number with the
result.
which is
5 × 12 = 60
Using a system of equations, it is found that since 20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
<h3>What is a system of equations?</h3>
A system of equations is when two or more variables are related, and equations are built to find the values of each variable.
In this problem, the variables are:
- Variable c: number of child bikes.
- Variable a: number of adult bikes.
Each child bike requires 4 hours to build, as do each adult bike. The company has 100 hours of testing, hence:
4c + 4a = 100.
c + a = 25.
With 20 child bikes and 6 adult bikes in a week, we have that c = 20, a = 26, hence:
c + a = 26
20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
More can be learned about a system of equations at brainly.com/question/24342899
#SPJ1
A) x+3/2
b) x/f
c) 12/f
Mark brainliest please
Hope this helps you
Answer:
(3,-2)
Step-by-step explanation:
Rewrite in vertex form and use this form to find the vertex
Answer:
Diego
Step-by-step explanation:
Diego is because 1m = 100 and Diego is 165 and that is alote bigger from 1.7.