Answer:

Step-by-step explanation:
The constraints are
The red line represents the function

At 

At 

Two points are 
The blue line represents the function

at 

at 

Two points are 
The other two constraints are
,
. So, the point has to be in the first quadrant
From the graph it can be seen there are two points where the function will be maximum let us check them.




So, the maximum value of the function is
.
Step-by-step explanation:
The number of people to paint the bridge is inversely proportional to the number of hours it takes.
(If there are more people, it will take less time etc.)
9 people can paint the bridge in 5 hours.
=> 2 people can paint the bridge in 5 * (9/2) = 22.5 hours.
Answer:
36/43 I think.
Step-by-step explanation:
Wyzant
Answer:
7%
Step-by-step explanation:
.07x1 is .07, therefore tax rate
please give brainliest im desperate
Answer:
attached above with detail explanation.