1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ValentinkaMS [17]
3 years ago
8

I'm thinking of a number. When I multiply by 8 and add –1, I get –17. What's my number?

Mathematics
1 answer:
frosja888 [35]3 years ago
6 0

Say that you're thinking of number x

You multiply it by 8, and have 8x

You add -1 (i.e., you subtract 1) and have 8x-1

This equals -17, so you have

8x-1=-17

Add 1 to both sides

8x=-16

Divide both sides by 8:

x=-2

So, you were thinking of -2.

You might be interested in
What is the answer to 8-2(x+17)
Aleksandr-060686 [28]

Answer:

42-2x

Step-by-step explanation:

8-2(x+17)

8-2x+34

42-2x

8 0
4 years ago
What’s the answer to this problem??????
jok3333 [9.3K]

other factor for given polynomial is y+1

4 0
3 years ago
Read 2 more answers
To celabrate its 125th anniversary, a company produced 125 expensive teddy bears. These "125 karat Teddy Bears" are made of gold
Oxana [17]
N = 100000000 dollars
8 0
3 years ago
A particular electronic component is produced at two plants for an electronics manufacturer. Plant A produces 70% of the compone
Vesna [10]

Answer:

If a component received by the manufacturer is defective, the probability that it was produced at plant A is 0.5385 = 53.85%.

Step-by-step explanation:

We use the Bayes Theorem to solve this question.

Bayes Theorem:

Two events, A and B.

P(B|A) = \frac{P(B)*P(A|B)}{P(A)}

In which P(B|A) is the probability of B happening when A has happened and P(A|B) is the probability of A happening when B has happened.

In this question:

Event A: Defective component

Event B: Produced at plant A.

Plant A produces 70% of the components used

This means that P(B) = 0.7

Among the components produced at plant A, the proportion of defective components is 1%.

This means that P(A|B) = 0.01

Probability of a defective component:

1% of 70%(defective at plant A)

2% of 100 - 70 = 30%(defective at plant B). So

P(A) = 0.01*0.7 + 0.02*0.3 = 0.013

If a component received by the manufacturer is defective, the probability that it was produced at plant A is

P(B|A) = \frac{0.7*0.01}{0.013} = 0.5385

If a component received by the manufacturer is defective, the probability that it was produced at plant A is 0.5385 = 53.85%.

4 0
3 years ago
Which equation can be used to find the value of b if side a measures 8.7 cm? 8.7 + b = 54.6 17.4 + b = 54.6 26.1 + b = 54.6 34.8
Gnom [1K]
The correct equation is 8.7 + b = 54.6
because it is given that measure of side a is 8.7cm, in all other equations the values of a is different.
from the first equation we can find the value of b, that is
b = 54.6 - 8.7 = 45.9
so, value of b is 45.9cm
5 0
3 years ago
Other questions:
  • What type of transformation is shown?
    5·2 answers
  • In February, Calvin's school used 4,920 pounds of rock salt to melt
    12·1 answer
  • James bought 5 boxes of cookies and 2 cakes at the store for his party. The cakes cost $4 each and his total bill was $28.50, ho
    13·1 answer
  • A coin collection is made up of 34 coins, all nickels and dimes. The total value of the collection is $1.90. How many nickels ar
    15·1 answer
  • Expand and simplify (x-3) (x-4)
    12·2 answers
  • Peaches are being sold for $2 per pound.The customer created a model to represent the total cost of peaches bought. If x represe
    15·2 answers
  • Solve 7 pleaseeeeeeeeeeeeeeeee
    15·1 answer
  • If the polygon is a decagon, then it has ____sides?​
    9·2 answers
  • Square numbers less than 40​
    8·1 answer
  • 48 is what percent of 120
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!