The third side must be greater than 16 and less than 62
The answer is b
Source:
http://www.1728.org/trianinq.htm
Answer:
Each project has 2.500 man-hours
Step-by-step explanation:
Available man hours: 5000
For two projects Costs $
X: project A 10
Y: project B 12
Approach:
X + Y = 5000 => X = 5000 - Y
10 * X + 12 * Y = 55000
replacing:
10 * (5000 - Y) + 12 * Y = 55000
50000 - 10 * Y + 12 * Y = 55000
2 * Y = 55000 - 50000
Y = 5000/2
Y = 2500
For X:
X = 5000 - 2500
X = 2500
The number of hours available for each project are:
Projects Man hours
X: project A 2500
Y: project B 2500
Answer:
Generally an unbiased statistic is preferred over a biased statistic. This is because there is a long run tendency of the biased statistic to under/over estimate the true value of the population parameter. Unbiasedness does not guarantee that an estimator will be close to the population parameter.
Step-by-step explanation:
Let the length of the shortest side = x
The two longer sides that are equal = 3x
The are two equal longer sides, so their total is 3x + 3x = 6x
3x+ 3x + x= 35 Collect like terms on the left
7x = 35 Divide by 7 on both sides
x = 35/7
x = 5
Answer
Two long sides -- 15 cm each
Shortest side -- 5 cm