Answer:
1, 2, and 6
Step-by-step explanation:
5*.25=1.25 7*.25=1.75 12*.25=3
Answer:
he probability that the sample mean deviates from the population mean = 112 by no more than 4= 0.9050
Step-by-step explanation:
mean = 112
sd = 12/sqrt(25) = 2.4
z = (x - μ)/σ
z = (116 - 112)/2.4 = 1.67
Therefore,
P(X >= 116) = P(z <= (116 - 112)/2.4)
= P(z >= 1.67)
= 1 - 0.9525
= 0.0475
z = (x - μ)/σ
z1 = (108 - 112)/2.4 = -1.67
z2 = (116 - 112)/2.4 = 1.67
Therefore, we get
P(108 <= X <= 116) = P((116 - 112)/2.4) <= z <= (116 - 112)/2.4)
= P(-1.67 <= z <= 1.67) = P(z <= 1.67) - P(z <= -1.67)
= 0.9525 - 0.0475
= 0.9050
Answer:
B and D.
Step-by-step explanation:
Explanation:
a scale drawing that has a scale of 1 centimeter to 2 feet, with a width of 6 centimeters and a length of 8 centimeters
a scale drawing that has a scale of 1 centimeter to 8 feet with a width of 1.5 centimeters and a length of 2 centimeters
About 3 gallons of blue paint will be needed because if you add 175+175 it equals 350 and then add another 175 it equals 525.
Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.