Answer:
2.5 * 10⁷
Step-by-step explanation:
- 25 * 10⁶
- 2.5 * 10 * 10⁶
- 2.5 * 10⁷
Answer:
Answer to question a = 95.4
Answer to question b = UCL = 96.07
LCL = 94.73
Answer to question c = Process is still in control
Step-by-step explanation:
a. The computation of estimate mean is as shown below:-
= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-
= 95.4 + 0.67082
= 96.07
= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is still in control
Answer:
8.067>8.06>8.006
Step-by-step explanation:
Remember that what ever the number is after the decimal is the the greatest.
1) figure out interest amount
400x.12= 48
2) add interest and loan amount
400+48= 448
It is incorrect because 20 + (-2) = 18, which is rational.