Answer:
Predictive
Explanation:
There is a wide variety of life cycles applicable to project management. In this regard, we currently have as a reference two somewhat extreme approaches that mark two very different ways of dealing with projects. The predictive approach and the agile approach.
A predictive approach involves a great effort in initial planning and re-planning every time changes are accepted in the project. Therefore, this approach is recommended for changing but not highly changing environments. Although this approach is applicable to any type of project, clear examples of application would be the construction of a subway line, a bridge, the development of critical software. That is, projects where correct and detailed planting is key.
Answer:
the answer is the explaination
Explanation:
Present beach erosion prevention methods include sand dunes, vegetation, seawalls, sandbags, and sand fences. Based on the research conducted, it is evident that new ways to prevent erosion must be obtained. Each way that is currently used has extensive negative effects on beaches and their natural tendencies.
Answer: No
Explanation:
The force F required is equal to the Force exerted in stretching the first material since conditions are the same
A series circuit is a closed circuit in whicj the current flows through one path.