Answer:
The capability index for the process is 0.889
Step-by-step explanation:
Here, we want to compute the capability index for the process
To get this, we need some important parameters which we already have stated in the question
USL ( upper standard limit) = 0.048
LSL (lower standard limit) = 0.032
mean = 0.04
standard deviation = 0.003
We apply the formula as seen in the attachment below
Kindly understand that we are to calculate the Z upper and Z lower
The smallest value between the two will be our Z minimum
This is what we shall apply in the capability index formula which mathematically is;
Z minimum/3
From calculation:
Z lower = Z upper = 2.67
So therefore;
capability index = 2.67/3 = 0.889
Answer:
z=3.3 repeating
Step-by-step explanation:
Move all terms that don't contain z to the right side and solve.
Well the answer options are a bit confusing but the steps are 1, 2, & 3.
The side length is the cube root of 460.
cube root(460) = 460^(1/3)
That's approximately 7.7
Answer:
5
Step-by-step explanation:
Productivity: My candy bar company made 100 million bars last year, sold for $1 each. I also paid [L] people last year, with an average salary of $100K last year. I have overhead cost of $10M. What was my TOTAL productivity (no units, rounded to 2 decimal places)?
Solution:
Total productivity is the average of labour and capital productivity weighted and adjusted to price fluctuations. It is the ratio of total output to the total input. The total productivity is given by the formula:
Total productivity = total output / total input
Total output = Revenue = number of bars sold * price per bar
Total output = 100 million * $1 = $100 million
Total input = Total salary + overhead cost
Total salary = number of people * average salary = 100 *$100000 = $10 million
overhead cost = $10 million
Total input = $10 million + $10 million = $20 million
Total productivity = total output / total input = $100 million / $20 million
Total productivity = 5