Answer:
Option C is correct. Option f is the same as option C
Step-by-step explanation:
From the question, There are three high schools in the district, each with grades between nine to twelve. The school board decided to pool all of the students together and randomly samples 250 students in the whole district that has schools between the grade of nine to twelve.
In order to test for high school students in the district for Attention Deficit disorder(ADD), they could have chosen any 250 students from any school with grades betweem nine to twelve throughout the district.
Answer:
Train A is faster by a factor of 1.01
Step-by-step explanation:
Given:
Train A:
Distance = 175 Miles
Time = 4 Hours
Train B:
y=43.5x
To Find:
which train travels at a faster rate in by what factor =?
Solution:
The speed of the train A = 
The speed of train A =
The speed of train A = 43.75 miles per hour
Speed of the train B is the slope of the given line
The standard equation of the slope of the line is
y = mx+b
where m is the slope
and we are given with
y = 43.5x
So comparing with the standard equation
m = 43.5
Hence the speed of train B is 43.5 miles per hours
Train A travels faster


rate =1.01
Since 57x17=969 I did 969-942 and got 27 so there is 16 full rows and then 27 left over so that means it won’t be a full row but 27 extra seats will be filled. (If your wondering where the 17 came from that’s how many rows can be made that’s over 942 because if I did 57x16 it would equal 912 and I would not have had a full row of chairs)
Since we are asked for tge graph that represent the total cost for the x numbers of lesson, it will be helpful to illustrate it first this way
for each lesson it will cost $30 dollars
1 lesson $30
2 lessons $60
3 lessons $90
4 lessons $120
5 lessons $150
So from this set of numbers , it is apparent that the grqph in letter c represents the total costs for x numbers of lessonsseethati
Ugh this is the worst 55559