Answer:
0
Step-by-step explanation:
Quadratic equation

The discriminant is the part of the quadratic formula within the square root symbol:
. The discriminant indicates if there are two solutions, one solution, or none.
The discriminant can be positive, zero or negative which determines how roots exist for the given quadratic equation.
So, a positive discriminant tell us that the quadratic has two different real solutions.
A discriminant of zero tell us that the quadratic has two real and equal solutions.
And a negative discriminant tell us that none of the solutions are real numbers.
In this case: 25x^2-10x+1=0
We can see that
a= 25 b=-10 c=1
Using: 
We have 
the answer is zero, so the quadratic has two real and equal solutions
Answer:
45
Step-by-step explanation:
Order of Operations: BPEMDAS
Step 1: Write out expression
5(2) + 5(7)
Step 2: Multiply
10 + 35
Step 3: Add
45
Answer:
a
Step-by-step explanation:
The volume (V) of a cone is calculated as
V = πr²h ( r is the base radius and h the perpendicular height )
To calculate the height h use the right triangle formed by the radius and the inclined side.
Given diameter = 22, then r = 22 ÷ 2 = 11 cm
Using Pythagoras' identity on the right triangle, then
h² + 11² = 61² , that is
h² + 121 = 3721 ( subtract 121 from both sides )
h² = 3600 ( take the square root of both sides )
h =
= 60
Thus
V = π × 11² × 60
= 3.14 × 121 × 60 ≈ 22796.4 cm³ → a
The answer for the exercise is the third option, which is: Hexagon.
The explanation is shown below:
As you can see in the figure attached, the cross section is a polygon of six sides and six angles. Therefore, it has six vertexes. In geometry, this type of polygon is known as "Hexagon".
Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.