Answer: critical chain method
Explanation:
Critical chain method is a technique that modifies the project schedule to account for limited resources by addition of duration buffets that are non-work schedule activities to maintain focus on the planned activity durations.
<span>Igneous
rocks are formed through the lava and magma cools then crystallizes.
Igneous rocks can also be form without going through crystallization. The occurrence
of igneous rocks may undergo with 2 different process; the intrusive or
plutonic, or the extrusive or volcanic. Intrusive igneous rocks are from magma
that cools and became solid inside the crust of the earth surrounded with
country rocks. While the extrusive igneous rocks are those rocks that formed in
the crust surface as a result of melting of rocks inside the mantle.</span>
Chavez is most likely in favor of the Cannon-Bard Theory, as he's advocating that emotions can not be associated to specific physiological changes. When he points out that the autonomic nervous system is functioning simultaneously and isn't the cause for the variation in emotional responses, he's most likely talking about the Cannon-Bard Theory.