Okay so the circle on the line plot, if it is empty In the middle it is > or < if it is solid it is ≤ ≥. In this case it not solid so it will be > or < . The plot is at -1 1/2 and is going positive. So it would be a > -1 1/2
Answer:
The limit that 97.5% of the data points will be above is $912.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

Find the limit that 97.5% of the data points will be above.
This is the value of X when Z has a pvalue of 1-0.975 = 0.025. So it is X when Z = -1.96.
So




The limit that 97.5% of the data points will be above is $912.
9514 1404 393
Answer:
D) 6.003 ÷ 12
Step-by-step explanation:
All of the quotients differ from 0.5 by at least one order of magnitude except ...
6.003/12 = 0.50025
__
The others are ...
A: 0.301/60 = 0.0050166... (repeating)
B: 0.051/10 = 0.0051
C: 2.499/49 = 0.051
Answer:
In the equation y = mx + b for a straight line, the number m is called the slope of the line. Let x = 0, then y = m • 0 + b, so y = b. The number b is the coordinate on the y-axis where the graph crosses the y-axis.
Answer:135 degrees
Step-by-step explanation: Because a octagon equals 1080 and since there are eight sides you divide it by 8 and get 135