P(x, y) Q(x,y)
P(-2, -1) start at 0. Go to the left two squares, then go down 1 square. mark a point there
Q(2, 4) start at 0. Go to the right two squares, go up 4 squares. mark a point there.
connect two points
make a right triangle
Then use the pythereom


To estimate this we can do it like this:-
<span>
Way #1
3.4 = 3
6 = 6
3 </span>÷ 6 = <span>0.5
So, to estimate 3.4 </span>÷ 6 we round 3.4 to the nearest whole number and den divide. Den d answer is our estimated answer!
3.4 ÷ 6 = 0.5
Hope I helped ya!!
Answer:
The mode of the data for Store 2 is greater than the mode of the data for Store 1.
Step-by-step explanation:
So from 98 to 110.92 is just 12.92 extra bucks.
if we take 98 to be the 100%, what is 12.92 off of it in percentage?
Answer:
There is a 34.13% probability that the actual return will be between the mean and one standard deviation above the mean.
Step-by-step explanation:
This is problem is solving using the Z-score table.
The Z-score of a measure measures how many standard deviations above/below the mean is a measure. Each Z-score has a pvalue, that represents the percentile of a measure.
What is the probability that the actual return will be between the mean and one standard deviation above the mean?
One measure above the mean is 
The mean is 
This means that this probability is the pvalue of
subtracted by the pvalue of
.
has a pvalue of 0.8413.
has a pvalue of 0.50.
This means that there is a 0.8413-0.50 = 0.3413 = 34.13% probability that the actual return will be between the mean and one standard deviation above the mean.