Answer:
55 mph
Step-by-step explanation:
220m per 4 hours
so 220 devieded by 4 gives u your answer
If you mean as a decimal, it's 30.125.
Let us determine each of their rates of work:
Since Tiana can clear the field in 3 hours, meaning she can do 1/3 of the work per hour.
In the same way, Jacob can do 1/2 of the work per hour.
Now, what would be the rate of work if they were working together? Let's look at it like this:
Hours to complete the job:
Tiana = 3
Jacob = 2
Together = t
Work done per hour:
Tiana = 1/3
Jacob = 1/2
Together = 1/t
If you add their labor together:
1/3 + 1/2 = 1/t
5/6 = 1/t
t = 6/2 = 1.2
Together, they can clear the field in 1.2 hours.
Answer:
The line segments are parallel.
Step-by-step explanation:
First, I never have graph paper when it is needed so I suggest Geogebra.com.
Now slope is found by rise over run so I took the points on the graph and counted where they intersected with any other points on the line. AB was 2/1 which means 2. I did the same for the other line segment and found 2/1 : 2. so both of the slopes are the same so you have parallel lines.