For this case we have the following vectors:

The dot product of two vectors is a scalar.
The point product consists of multiplying component by component and then adding the result of the multiplication of each component.
For the product point of the vectors a and b we have:
Answer:
The product point of the vectors a and b is:
Answer:
A.
Step-by-step explanation:
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer:
$56.70 all together
Step-by-step explanation:
$22.14 for the jeans
$34.56 for the jacket
$56.7 all together
Take your tax and move the decimal over to the left by 2 spaces
8. becomes .08
take .08 and multiply it by the price so
20.50 x .08= 1.64
and
32 x .08=2.56
the number you get is how much the tax is, $1.64 is 8% of $20.15
take that number and add it to your price
$1.64+$20.50= $22.14
Answer:
what does this mean
Step-by-step explanation: