4b^2 - 16 =
4(b^2 - 4) =
4(b + 2)(b - 2)
<em>Please </em>use for reference. Merci.
To find rate of change simply divide y/x.
hour 2: 56/2=28
hour 4: 125/4~about 31.3 or 31
hour 5: 164/5=32.8 or ~ 33
hour 8: 271/8 ~ about 34 or 33.875
hour 13: 404/13 ~ about 31 or 31.0769231
What numbers are the largest?
hours 5 and 8
Thus, the correct answer was option C.
Answer:
Given:
Two trail maps:
Trail on the first map = 8 cm
Trail on the second map = 6 cm
Scale on first map = 1 cm : 2 km
A) What is the scale factor from the map to the actual trail?
For the first map, the scale factor is 1 cm: 2km. Therefore the actual trail is 8 centimeters * 2 kilometers = 16 km.
The scale factor of the second map is 16 km / 6 cm = 2.67 km : 1 cm
B) The length of the actual trail is 16 kilometers.
Step-by-step explanation:
That is 2015! or 2015 factorial
that is big
not sure if a joke but the answer is (see attachment)
or about 1.15369522906899370...*10⁵⁷⁸⁶ in scientific notation
Answer:
1.89 is the standard deviation of households who own a riding mower
Step-by-step explanation:
Let the random variable X denote the number of households owning a riding lawn mower. From the given information, X will be a Binomial random variable with parameters; n = 17 and p = 30% = 0.3
The standard deviation of X;

