Answer:
phase measurement and the information content
Explanation:
The full form of RTK is Real Time Kinematic. It is used for satellite navigation technique to increase the precision of the position data that is derived from the positioning systems based on satellites like the NavIC, GPS, Galileo, BeiDou and GLONASS. It takes help of the measurements of phase of signal's carrier wave and also the information content of these signals and it also relies on the single interpolated virtual station in order to provide the real time corrections and provide correct and accurate information.
Answer:
14.52 minutes
<u>OR</u>
14 minutes and 31 seconds
Explanation:
Let's first start by mentioning the specific heat of air at constant volume. We consider constant volume and NOT constant pressure because the volume of the room remains constant while pressure may vary.
Specific heat at constant volume at 27°C = 0.718 kJ/kg*K
Initial temperature of room (in kelvin) = 283.15 K
Final temperature (required) of room = 293.15 K
Mass of air in room= volume * density= (4 * 5 * 7) * (1.204 kg/m3) = 168.56kg
Heat required at constant volume: 0.718 * (change in temp) * (mass of air)
Heat required = 0.718 * (293.15 - 283.15) * (168.56) = 1,210.26 kJ
Time taken for temperature rise: heat required / (rate of heat change)
Where rate of heat change = 10000 - 5000 = 5000 kJ/hr
Time taken = 1210.26 / 5000 = 0.24205 hours
Converted to minutes = 0.24205 * 60 = 14.52 minutes
Answer:
i) 43.55 kg/s
ii) 40 m/s
iii) -199.32 KW
Explanation:
To resolve the above question we have to make some assumptions :
- mass flow through the system is constant
- The only interactions that are between the system and the surrounding are work and heat
- The fluid is uniform
i) first we have to determine the mass flow rate of the air
M = 
=
---------- (1) hence M = 43.55 kg/s
ii) using this relationship : A1V1 = A2V2 hence V1 = (0.2/0.5) * 100 = 40m/s ( inlet velocity )
input this value into equation 1
iii) Next we will determine the power required to run compressor
attached below
power required = -199.32 KW ( this value indicates that there is power supplied )
Answer:
Considering the guidelines of this exercise.
The pieces produced per month are 504 000
The productivity ratio is 75%
Explanation:
To understand this answer we need to analyze the problem. First of all, we can only produce 2 batches of production by the press because we require 3 hours to set it up. So if we rest those 6 hours from the 8 of the shift we get 6, leaving 2 for an incomplete bath. So multiplying 2 batches per day of production by press we obtain 40 batches per day. So, considering we work in this factory for 21 days per month well that makes 40 x 21 making 840 then we multiply the batches for the pieces 840 x 600 obtaining 504000 pieces produced per month. To obtain the productivity ratio we need to divide the standard labor hours meaning 6 by the amount of time worked meaning 8. Obtaining 75% efficiency.