How many types of motion are fluid element motion include?

Engineering
1 answer:
Brut [27]3 years ago
8 0

Answer:

Fluid element motion includes four type of motion or we can say that it undergoes four types of deformation and these are listed below:

  • Tranlational motion
  • Shear Strain
  • Dilation (also known as Extensional Strain)
  • Rotational motion

You might be interested in
For RTK to work, what do we need besides two or more receivers collecting data from a sufficient number of satellites simultaneo
Liula [17]

Answer:

phase measurement and the information content

Explanation:

The full form of RTK is Real Time Kinematic. It is used for satellite navigation technique to increase the precision of the position data that is derived from the positioning systems based on satellites like the NavIC, GPS, Galileo, BeiDou and GLONASS. It takes help of the measurements of phase of signal's carrier wave and also the information content of these signals and it also relies on the single interpolated virtual station in order to provide the real time corrections and provide correct and accurate information.

7 0
3 years ago
3. A 4-m × 5-m × 7-m room is heated by the radiator of a steam-heating system. The steam radiator transfers heat at a rate of 10
Natali [406]

Answer:

14.52 minutes

<u>OR</u>

14 minutes and 31 seconds

Explanation:

Let's first start by mentioning the specific heat of air at constant volume. We consider constant volume and NOT constant pressure because the volume of the room remains constant while pressure may vary.

Specific heat at constant volume at 27°C = 0.718 kJ/kg*K

Initial temperature of room (in kelvin) = 283.15 K

Final temperature (required) of room = 293.15 K

Mass of air in room= volume * density= (4 * 5 * 7) * (1.204 kg/m3) = 168.56kg

Heat required at constant volume: 0.718 * (change in temp) * (mass of air)

Heat required = 0.718 * (293.15 - 283.15) * (168.56) = 1,210.26 kJ

Time taken for temperature rise: heat required / (rate of heat change)

Where rate of heat change = 10000 - 5000 = 5000 kJ/hr

Time taken = 1210.26 / 5000 = 0.24205 hours

Converted to minutes = 0.24205 * 60 = 14.52 minutes

4 0
4 years ago
Air enters an adiabatic compressor through 0:5m2 opening and exhausts through a 0:2m2 opening. The inlet conditions of air are 2
gladu [14]

Answer:

i) 43.55 kg/s

ii) 40 m/s

iii)  -199.32 KW

Explanation:

To resolve the above question we have to make some assumptions :

  • mass flow  through the system is constant
  • The only interactions that are between the system and the surrounding are work and heat
  • The fluid is uniform

i) first we have to determine the mass flow rate of the air

M = (\frac{P1}{RT1} )A1v1

    = ( \frac{200}{0.287*325} ) 0.5 * V1 ---------- (1) hence  M = 43.55 kg/s

ii) using this relationship : A1V1 = A2V2 hence V1 = (0.2/0.5) * 100 = 40m/s (    inlet velocity )

input this value into equation 1

iii) Next we will determine the power required to run compressor

attached below

power required = -199.32 KW ( this value indicates that there is power supplied )

8 0
3 years ago
When external appearances have little overall significance, they are termed When external appearances have little overall signif
Montano1993 [528]

Answer:

They are termed Genotypes.

5 0
3 years ago
There are 20 forging presses in the forge shop of a small company. The shop produces batches of forgings requiring a setup time
Aleksandr-060686 [28]

Answer:

Considering the guidelines of this exercise.

The pieces produced per month are 504 000

The productivity ratio is 75%

Explanation:

To understand this answer we need to analyze the problem. First of all, we can only produce 2 batches of production by the press because we require 3 hours to set it up. So if we rest those 6 hours from the 8 of the shift we get 6, leaving 2 for an incomplete bath. So multiplying 2 batches per day of production by press we obtain 40 batches per day. So, considering we work in this factory for 21 days per month well that makes 40 x 21  making 840 then we multiply the batches for the pieces 840 x 600 obtaining 504000 pieces produced per month. To obtain the productivity ratio we need to divide the standard labor hours meaning 6 by the amount of time worked meaning 8. Obtaining 75% efficiency.

4 0
4 years ago
Other questions:
  • 3. A competency-based training program is
    13·1 answer
  • A quack is a data structure combining properties of both stacks and queues. It can be viewed as a list of elements written left
    5·1 answer
  • Define cooling tower "range" as it applies to cooling towers.
    5·1 answer
  • Give me an A please!!!¡!!!!¡
    5·1 answer
  • How did engineers help to create a ceiling fan
    8·1 answer
  • Which step of the critical thinking process determines the main idea to be understood in order for the information or data to ma
    14·1 answer
  • Which of the following helps to ensure a centered steering wheel when performing a wheel alignment?
    10·1 answer
  • B is to 10 as 7 is to 2 setting porption
    9·1 answer
  • Fill in the correct answer.
    13·1 answer
  • A plate of width 84mm and thickness 10mm is to be welded to another plate by means of double parallel fillets. The plates are su
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!