1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Hoochie [10]
3 years ago
11

The ABC Corporation manufactures and sells two products: T1 and T2. 20XX budget for the company is given below:

Engineering
1 answer:
Sliva [168]3 years ago
5 0

Answer:

The ABC Corporation

a) Total Expected Revenue (in dollars) for 20XX:

Revenue from T1 = 60,000 x $165 = $26,400,000

Revenue from T2 = 40,000 x $250 = $10,000,000

Total Revenue from T1 and T2 = $36,400,000

b) Production Level (in units) for T1 and T2

                                           T1                       T2

Total Units sold             160,000           40,000

Add Closing Inventory   25,000             9,000

Units Available for sale 185,000           49,000

less opening inventory  20,000             8,000

Production Level          165,000 units 41,000 units

c) Total Direct Material Purchases (in dollars):

Cost of direct materials used    T1                T2

A:       (165,000 x 4 x $12)   $7,920,000   $2,460,000 (41,000 x 5 x $12)

B:       (165,000 x 2 x $5)       1,650,000          615,000 (41,000 x 3 x $5)

C:                                                           0          123,000 (41,000 x 1 x$3)

Total cost                            $9,570,000     $3,198,000 Total = $12,768,000

Cost of direct per unit = $58 ($9,570,000/165,000) for T1 and $78 ($3,198,000/41,000) for T2

Cost of direct materials used for production $12,768,000

Cost of closing direct materials:

                 A  (36,000 x $12)  $432,000

                 B (32,000 x $5)        160,000

                 C (7,000 x $3)            21,000             $613,000

Cost of direct materials available for prodn   $13,381,000

Less cost of beginning direct materials:

                 A  (32,000 x $12)        $384,000

                 B  (29,000 x $5)            145,000

                 C  (6,000 x $3)                18,000        $547,000

Cost of direct materials purchases               $12,834,000

d) The Total Direct Manufacturing Labor Cost (in dollars):

                                             T1                         T2

Direct labor per unit              2 hours                  3 hours

Direct labor rate per hour    $12                        $16

Direct labor cost per unit   $24                          $48

Production level              165,000 units        41,000 units

Labor Cost ($)                $3,960,000        $1,968,000

Total labor cost  $5,928,000 ($3,960,000 + $1,968,000)

e) Total Overhead cost (in dollars):

Overhead rate  = $20 per labor hour

Overhead cost per unit: T1 = $40 ($20 x 2) and T2 = $60 ($20 x 3)

T1 overhead = $20 x 2  x 165,000) = $6,600,000

T2 overhead = $20 x 3 x 41,000) =    $2,460,000

Total Overhead cost =                        $9,060,000

Cost of goods produced:

Cost of opening inventory of materials  = $547,000

Purchases of directials materials             12,834,000

less closing inventory of materials     =      $613,000

Cost of materials used for production    12,768,000

add Labor cost                                           5,928,000

add Overhead cost                                    9,060,000

Total production cost                            $27,756,000

f) Total cost of goods sold (in dollars):

Cost of opening inventory =          $3,928,000

Total Production cost             =    $27,756,000

Cost of goods available for sale  $31,684,000

Less cost of closing inventory       $4,724,000

Total cost of goods sold            $26,960,000

g) Total expected operating income (in dollars)

Sales Revenue:  T1 and T2  $36,400,000

Cost of goods sold                 26,960,000

Gross profit                             $9,440,000

less marketing & distribution      400,000

Total Expected Operating Income = $9,040,000

Explanation:

a) Cost of beginning inventory of finished goods:

T1, (Direct materials + Labor + Overhead) X inventory units =

T1 = 20,000 x ($58 + 24 + 40) = $2,440,000

T2 = 8,000 ($78 + 48 + 60) = $1,488,000

Total cost of beginning inventory = $3,928,000

b) Cost of closing Inventory of finished goods:

T1 = 25,000 x ($58 + 24 + 40) = $3,050,000

T2 = 9,000 ($78 + 48 + 60) = $1,674,000

Total cost of closing inventory = $4,724,000

You might be interested in
Pls help and solve this problem. I don't have an idea to solve this.
lions [1.4K]

Answer:

MIS HIEVOSTES bbbbbbbbbbbb MIS HUEVOTES

7 0
3 years ago
A specimen of copper having a rectangular cross section 15.2 mm × 19.1 mm (0.60 in. × 0.75 in.) is pulled in tension with 44,500
lukranit [14]

Answer:

The resulting strain is 1.39\times 10^{-3}.

Explanation:

A specimen of copper having a rectangular cross section 15.2 mm × 19.1 mm

Force, F = 44,500 N

Th elastic modulus of Cu to be 110 GPa

The resulting strain is given by the formula as follows :

\epsilon=\dfrac{F}{AE}

E is elastic modulus of Cu is are of cross section

\epsilon=\dfrac{44500}{15.2\times 19.1\times 10^{-6}\times 110\times 10^9}\\\\\epsilon=1.39\times 10^{-3}

So, the resulting strain is 1.39\times 10^{-3}.

6 0
4 years ago
Oil with a kinematic viscosity of 4 10 6 m2 /s fl ows through a smooth pipe 12 cm in diameter at 2.3 m/s. What velocity should w
Setler79 [48]

Answer:

Velocity of 5 cm diameter pipe is 1.38 m/s

Explanation:

Use following equation of Relation between the Reynolds numbers of both pipes

Re_{5} = Re_{12}

\sqrt{\frac{V_{5}XD_{5}  }{v_{5}}}= \sqrt{\frac{V_{12}XD_{12}  }{v_{12}}}

Re_{5} = Reynold number of water pipe

Re_{12} = Reynold number of oil pipe

V_{5} = Velocity of water 5 diameter pipe = ?

V_{12} = Velocity of oil 12 diameter pipe = 2.30

v_{5} = Kinetic Viscosity of water = 1 x 10^{-6} m^{2}/s

v_{12} = Kinetic Viscosity of oil =  4 x 10^{-6} m^{2}/s

D_{5} = Diameter of pipe used for water = 0.05 m

D_{12} = Diameter of pipe used for oil = 0.12 m

Use the formula

\sqrt{\frac{V_{5}XD_{5}  }{v_{5}}}= \sqrt{\frac{V_{12}XD_{12}  }{v_{12}}}

By Removing square rots on both sides

{\frac{V_{5}XD_{5}  }{v_{5}}}= {\frac{V_{12}XD_{12}  }{v_{12}}}

{V_{5}= {\frac{V_{12}XD_{12}  }{v_{12}XD_{5}\\}}xv_{5}

{V_{5}= [ (0.23 x 0.12m ) / (4 x 10^{-6} m^{2}/s) x 0.05 ] 1 x 10^{-6} m^{2}/s

{V_{5} = 1.38 m/s

4 0
3 years ago
ILL GIVE YOU BRAINLIEST PLEASE HELP PLEASE
Lesechka [4]

Answer:

try to pop it back in good luck im scared for you

4 0
3 years ago
13–27. The conveyor belt is moving downward at 4 m>s. If the coefficient of static friction between the conveyor and the 15-k
Feliz [49]

Answer:

See explanation for step by step procedure to get answer.

Explanation:

Given that:

The conveyor belt is moving downward at 4 m>s. If the coefficient of static friction between the conveyor and the 15-kg package B is ms = 0.8, determine the shortest time the belt can stop so that the package does not slide on the belt.

See the attachments for complete steps to get answer.

4 0
3 years ago
Other questions:
  • If a motor driven by PWM using half-bridge operation has a speed of 1,426 rpm at a duty cycle of 100% (full forward), what will
    5·1 answer
  • For some transformation having kinetics that obey the Avrami equation , the parameter n is known to have a value of 1.1. If, aft
    6·1 answer
  • A clay sample has a wet mass of 417 g, a volume of 276 cm3, and a specific gravity of 2.70. When oven dried, the mass becomes 22
    10·1 answer
  • PDAs with two stacks are strictly more powerful than PDAs with one stack. Prove that 2-stack PDAs are not a valid model for CFLs
    12·1 answer
  • Why was the lack of preparedness of the Federal Emergency Management Agency in the Hurricane Katrina disaster so damaging for th
    12·1 answer
  • A rod is made from two segments: AB is steel and BC is brass. It is fixed at its ends and subjected to a torque of T = 680 N.m.
    5·1 answer
  • Air expands through a turbine from 10 bar, 900 K to 1 bar, 500 K. The inlet velocity is small compared to the exit velocity of 1
    5·1 answer
  • When you look at a drawing, how do you know if you are looking at US
    11·1 answer
  • Select the correct answer. Which physical quantity measures the rate at which an object’s velocity changes?
    11·1 answer
  • Please help me. I have no idea what I'm doing.​
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!