1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
UNO [17]
3 years ago
8

A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer. Seven bills w

ill be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill. The appropriate control chart is a(n):
Mathematics
1 answer:
Oksi-84 [34.3K]3 years ago
5 0

Answer:

R - chart

Step-by-step explanation:

Range chart (R chart) is a control chart used for processes with two or more subgroups to determine if a process is stable or not. It monitors the mean and range of a normally distributed variable simultaneously collected at regular intervals during a given time. It is used when measuring small subgroups between two and ten at regular intervals from a process. Iy is a;so used for constant subgroups.

You might be interested in
A rhombus can always be classified as which of the following?
ollegr [7]

Answer:

square

rectangle

quadrilateral

Step-by-step explanation:

Sides are all equal

3 0
3 years ago
What is the greatest common factor of 73 and 30
sergij07 [2.7K]

Answer:1

Step-by-step explanation:

they have no other common factors

4 0
3 years ago
Read 2 more answers
Which quantity is use to generate the error bars on a graph?
rodikova [14]
The error bars are used to indicate the variability of the data presented in a graph.

There are several quantities that can be used to generate error bars in the graph. These are:
standard deviation
standard error
confidence interval

Usually, one standard deviation above and below the mean is used although it is advised to indicate which variability data is used to generate the error bars in the graph since the 3 quantity given are not equal.
7 0
3 years ago
Find the value of the variable and YZ if Y is between X and Z. XY= 11, YZ=4c, XZ=83
svet-max [94.6K]
So you know the whole line is XZ which is 83.Then you find out it is in two parts so that is XY and YZ which are 11 and 4c. You can make the equation:

11+4c=83
4c=72
c=18

c=18 and YZ=72

8 0
3 years ago
Read 2 more answers
How does moving the place of a digit change its value
AlexFokin [52]
In the familiar decimal number system that we use every day, moving the place
of a digit changes its value by a power of 10 .

In a system of numbers to any other base, moving the place of a digit changes
its value by a power of whatever the base of that number system is.
6 0
3 years ago
Other questions:
  • Kim’s lunch cost is 12.74 she included a tip of 15%
    7·1 answer
  • Martin is building a sandcastle at the
    10·2 answers
  • students in mr.halperts class are measuring the width of a rectangle that is 6 2/3 inches. the length of the rectangle is twice
    11·1 answer
  • Classify each figure on the triangle
    14·2 answers
  • What is the squared root of 9 times by 1,000,000,001 divided by 4 and subtracted by 8672 then cubed twice
    6·1 answer
  • I need 4 more tryna go to sleep rn :/
    15·1 answer
  • What is the probability of rolling an even number first and an odd number second?
    10·2 answers
  • Please can someone help there 10 Points for it!!!!
    13·1 answer
  • Which is the graph of a logarithmic function? On a coordinate plane, a curve starts in quadrant 4 and curves up into quadrant 1.
    11·1 answer
  • Solve with explanation
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!