Answer:
Each project has 2.500 man-hours
Step-by-step explanation:
Available man hours: 5000
For two projects Costs $
X: project A 10
Y: project B 12
Approach:
X + Y = 5000 => X = 5000 - Y
10 * X + 12 * Y = 55000
replacing:
10 * (5000 - Y) + 12 * Y = 55000
50000 - 10 * Y + 12 * Y = 55000
2 * Y = 55000 - 50000
Y = 5000/2
Y = 2500
For X:
X = 5000 - 2500
X = 2500
The number of hours available for each project are:
Projects Man hours
X: project A 2500
Y: project B 2500
Answer:
Step-by-step explanation:
20.1metres / seconds
We want to convert to metres /minutes
It is known that 60seconds=1minutes
So therefore, either we multiply 20.1metres/seconds by
60seconds/1minutes
Or
1minutes/60seconds
Multiplying with the above does not change the magnitude of the quantity because it is like we are multiplying by 1.
Since we want to cancel seconds and it is in the denominator, so to do this we need to multiply with the fraction that has the seconds as numerator.
So, we are going to multiply with 60seconds/1minutes
20.1metres/seconds ×60seconds/minutes
1206metres/minutes.
So the correct fraction is the StartFraction 60 seconds Over 1 minute, which is the third option
distance between two points is [(x2-x1)^2 +(y2-y1)^2]^1/2
I.e,[{5-1)^2+(0-3)^2]^1/2
[16+9]^1/2
[25]^1/2
5
Slope = 1
y-intercept = -3, which can be expressed as (0,-3).
y - y_1 = m(x - x_1)
y -(-3) = 1(x - 0)
y + 3 = x
The slope-intercept form is
y = x - 3.
The standard form is Ax + By = C.
y = x - 3
3 = x - y
Done.
Answer:
4.5 minutes
Step-by-step explanation:
first convert 3/4 to a decimal so you can multiply it which would be .75
so then .75 times 6=
4.5