Answer:
The answers are that a = -5 and b = 1
Step-by-step explanation:
In order to find A and B, we first need to find the equation of the line. We can do this by using two ordered pairs and the slope formula. For the purpose of this activity, I'l use (0, 5) and (-3, 11)
m(slope) = (y2 - y1)/(x2 - x1)
m = (11 - 5)/(-3 - 0)
m = 6/-3
m = -2
Now that we have this we can model this using point-slope form.
y - y1 = m(x - x1)
y - 5 = -2(x - 0)
y - 5 = -2x
y = -2x + 5
Now that we have the modeled equation we can use the ordered pair (a, 15) to solve for a.
y = -2x + 5
15 = -2(a) + 5
10 = -2a
-5 = a
And we can also solve for b using the ordered pair (2, b)
y = -2x + 5
b = -2(2) + 5
b = -4 + 5
b = 1
Answer:
The answer is below
Step-by-step explanation:
a) Cost of hiring the bicycle for 14 days is:
Cost = 65 * 14 days + 44 = 954 riyals
b) The number of days the bicycle is hired is to be the same as the number of days the bicycle is to be hired. Let us assume that the bicycle and helmet is to be hired for x days, hence:
Cost of bicycle = 65 * x + 14 = 65x + 44
Cost of helmet = 12.5 * x = 12.5x
Total cost = 65x + 44 + 12.5x = 77.5x + 44
Since 750 riyals is available, hence:
750 = 77.5x + 44
77.5x = 706
x = 9.11
Therefore the maximum number of days is 11. The total cost for 11 days is:
Total cost = 77.5(9) + 44 = 741.5 riyals
Money not spent = 750 riyals - 741.5 riyals = 8.5 riyals
Given the expression below

To find n
Open the brackets

Collect like terms

Since, the sides are not equal,
Hence, there is no solution
Answer:
which ones do you need answered? all of them? want to help
Step-by-step explanation:
The best estimate is probably 4